
Indiana: Traveling the old Monon Railroad

Panorama View of Two-Stage Ditch (10/18/2012)

Internal view of Darlington Covered Bridge, Montgomery County, Indiana, showing the Howe Truss construction

March 8, 2013. View from the outlet drainage structure looking towards the field (back to ditch).

View of the car show at the Darlington, Indiana annual Fish Fry and Festival, Saturday September 8th, 2012.

View of the annual Fish Fry and Festival, in Darlington.

View from Darlington Covered Bridge, Montgomery County, Indiana

View of the annual Fish Fry and Festi(2)

View from Darlington Covered Bridge, Montgomery County, Indiana

View from Darlington Covered Bridge, Montgomery County, Indiana

First Home

Internal view of Darlington Covered Bridge, Montgomery County, Indiana, showing the Howe Truss construction

View from Darlington Covered Bridge, Montgomery County, Indiana

BackPorch Day 1: Facing North

Back Porch Day 1: A Mess

BackPorch Day 1: Facing South

BackPorch Day 1: From the Steps

Hoosierland Wayfreight

Imperious the sign

CSX G04125

P851 Northbound at Linden (Veterans Unit in Tow)

Senior shoot...

20101003 IN between Purdue and airport135403677.jpg

LeConte's Sparrow at the Burn

That's when the sky came crashing down

#america #Americathebeautiful #amberwavesofgrain #midwestern #rurallife #feedingAmerica

Indiana: Farm Field of Soybeans

January 11, 2013. The first discharge event and initial "flushing" of the bioreactor. The orange color of the water is due to the high amounts of dissolved organic carbon that are leaching from the woodchips.

MOOOOO!

Like Wings of Angels

October 24, 2012

October 24, 2012

May 13, 2014. Inlet drainage control structure with the cover off to take in situ measurements.

May 13, 2014. The native grasses planted on top of the bioreactor have grown in, growing taller than the monitoring wells and tops of the drainage control structures.

April 4, 2013: The wet topsoil outlines the boundaries of the bioreactor. This suggest that when the bioreactor is fully saturated, water moves via capillary action into the top soil layer.

February 27, 2013

April 24, 2013: Bioreactor and surrounding fields very saturated.

September 22, 2012 PRE-CONSTRUCTION