Indiana: Traveling the old Monon Railroad
Panorama View of Two-Stage Ditch (10/18/2012)
March 8, 2013. View from the outlet drainage structure looking towards the field (back to ditch).
Neglected Barn
View of the car show at the Darlington, Indiana annual Fish Fry and Festival, Saturday September 8th, 2012.
View of the annual Fish Fry and Festival, in Darlington.
View of the annual Fish Fry and Festi(2)
Imperious the sign
20101003 IN between Purdue and airport135403677.jpg
Camp Collum 07-26-2014 3
Abandoned Church
January 14, 2013
Indiana: Farm Field of Soybeans
January 11, 2013. The first discharge event and initial "flushing" of the bioreactor. The orange color of the water is due to the high amounts of dissolved organic carbon that are leaching from the woodchips.
Senior shoot...
MOOOOO!
Like Wings of Angels
October 24, 2012
October 24, 2012
May 13, 2014. Inlet drainage control structure with the cover off to take in situ measurements.
May 13, 2014. The native grasses planted on top of the bioreactor have grown in, growing taller than the monitoring wells and tops of the drainage control structures.
That's when the sky came crashing down
April 4, 2013: The wet topsoil outlines the boundaries of the bioreactor. This suggest that when the bioreactor is fully saturated, water moves via capillary action into the top soil layer.
February 27, 2013
September 22, 2012 PRE-CONSTRUCTION
September 27, 2012
October 4, 2012
Two-Stage Ditch (10/17/2012)